Pigeon House Power Station – Poolbeg

Following on a previous assignment completed by Lee McCullough Consulting Engineers,  LMC (in conjunction with a team established by Shaffrey Architects) were commissioned by DCC to inspect and report on the condition of the former Pigeon House Power Station in late 2012. During the inspection process unstable structural elements were noted and the design and completion of essential temporary works were required to facilitate the completion of the project brief.

Client: DCC / Shaffrey Architects
Architects: Shaffrey Associates
LMC Engineers:  Norman Irvine and Frank Lee